Search results

1 – 10 of 30
Article
Publication date: 28 June 2021

Dan Wang, Xueqing Wang, Lu Wang, Henry J. Liu and Xiajie Jia

The purpose of this study is for examining the evolution of stakeholder influence and the trans-period effect (TPE) of process performance of public–private partnerships (PPPs)…

Abstract

Purpose

The purpose of this study is for examining the evolution of stakeholder influence and the trans-period effect (TPE) of process performance of public–private partnerships (PPPs). TPE refers to the ripple effect of project performance across different phases of a PPP.

Design/methodology/approach

Social network analysis is used to analyze each stakeholder’s influence on PPP performance. For examining the TPE, partial least squares structural equation modelling is conducted.

Findings

The performance in the five phases (e.g. initiation and planning, procurement, construction, operation and transition) of PPPs exhibits significant TPE. The stakeholder network varies in different phases. The most influential stakeholder is a public authority, followed by a public initiator and a private consortium.

Research limitations/implications

The project type of PPPs is not considered in the stakeholder network analysis. Future work should focus on developing a multidimensional stakeholder network by considering the typology of the project. Moreover, the TPE cannot reflect the relationships between the KPIs in the different phases, and thus, further study is required.

Practical implications

This research provides a useful tool for measuring the life cycle outputs and outcomes of PPPs through enhanced process-oriented performance measurement. The developed PMS enable practitioners to have a better understanding of the process performance of the projects and then ensure informed decision-making about actions to be required and taken to improve future performance.

Originality/value

This study contributes to knowledge of performance management by simultaneously addressing the process and stakeholder management theories within the context of PPPs. The proposed PMS provides an insight into managing stakeholders’ influences to enhance the life cycle performance of PPPs.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 1
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 29 July 2020

Dan Wang, Xueqing Wang, Mingshuai Liu, Henry Liu and Bingsheng Liu

The performance of public–private partnerships (PPPs) can be determined by a variety of factors, i.e. influencing factors (IFs). This study is undertaken for a purpose of…

Abstract

Purpose

The performance of public–private partnerships (PPPs) can be determined by a variety of factors, i.e. influencing factors (IFs). This study is undertaken for a purpose of identifying how such factors determine the project's performance (i.e. factor transmission patterns), particularly from the key stakeholders' perspectives.

Design/methodology/approach

A hybrid approach, which comprises a Social Network Analysis, ISM (i.e. Interpretive Structural Modeling) and an improved DEMATEL (i.e. Decision-Making Trail and Evaluation Laboratory), was developed to analyze the causal relationships between the identified IFs as well as the transmission patterns of their impacts on PPPs. Data were collected from interviews and questionnaire surveys.

Findings

The transmission patterns of the identified IFs cascade from project environment and features and stakeholders' relationship to the project company capabilities and project process. It is identified that the public authority has a higher level than that of the private entity in PPPs.

Research limitations/implications

It lacks longitudinal studies to investigate the dynamics of PPP stakeholder relationships and social networks. Future research needs to explore the transmission patterns of sub-factors affecting PPP performance and extend the applicability of the developed hybrid approach.

Practical implications

This research provides practitioners with a robust tool that is useful for and insights into enhancing the management of lifecycle performance. It ensures the public authorities and private entities embarking on PPPs will make an informed decision about the monitoring of the life cycle performance.

Originality/value

This study contributes to knowledge of managerial mechanisms that can be adopted to manage factors determining the performance of PPPs. It enables an understanding of stakeholders' roles in driving the life cycle performance of PPPs.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 May 2022

Dan-Yi Wang and Xueqing Wang

An optimal control model is built considering the private sector's opportunistic effort diversion and reciprocal effort improvement, while a numerical study is conducted to draw…

Abstract

Purpose

An optimal control model is built considering the private sector's opportunistic effort diversion and reciprocal effort improvement, while a numerical study is conducted to draw some managerial implications.

Design/methodology/approach

In infrastructure PPP projects, private sectors may opportunistically divert part of their effort from the current projects to other projects to allocate their limited human resources. Nevertheless, this effort diversion can be inhibited by dynamic incentives since the private sectors reciprocally exert greater effort into the current projects when receiving the dynamic incentives. This article investigates how the government specifies the output standard that the private sector should meet and offers dynamic incentives to mitigate the private sector's opportunistic effort diversion.

Findings

The output standard for the private sector to acquire the dynamic incentives should be specified as the output level corresponding to the private sector's optimal long-run stationary equilibrium (OLSE) effort level, which decreases with its reciprocal preference level but increases with its effort-diverting level. The optimal dynamic incentives comprise an initial incentive and a periodic OLSE incentive, which declines with the reciprocal preference level but improves with the effort-diverting level. Besides, the numerical study reveals that the government should distinguish whether the bidders have high effort-diverting levels and, if so, should focus on their reciprocal preference levels and decline the bidders with low reciprocal preference to avoid utility loss.

Originality/value

This article provides a theoretical model combining opportunistic behavior with reciprocal preference through an optimal control lens, thus embedding the problem of incentive design into a broader socioeconomic framework.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 August 2021

Dan Wang, Xueqing Wang, Lu Wang, Henry Liu, Michael Sing and Bingsheng Liu

This study aims to develop a Stackelberg Game Model for seeking the optimal subsidy plans with varying levels of government financial capability (GFC). Furthermore, the…

Abstract

Purpose

This study aims to develop a Stackelberg Game Model for seeking the optimal subsidy plans with varying levels of government financial capability (GFC). Furthermore, the scenario-based analysis is conducted and will enable governments to identify a comprehensive subsidy plan as follows: improve project performance and optimise social welfare.

Design/methodology/approach

A Stackelberg Game Model is developed to optimise the effectiveness of subsidies on the performance of public-private partnerships (PPPs).

Findings

According to the scenarios that are generated from the model, governments that are confronting with limited public budgets could reduce the intensity of performance incentives and increase the participation-oriented subsidy. Whilst a participation-oriented subsidy can stimulate private organisations’ willingness to participate in infrastructure PPPs, a performance-oriented subsidy is capable of facilitating the projects’ performances. Intuitively, the performance-oriented subsidy enables the private entities of PPPs to improve their efforts on the projects to realise higher profits. However, the participation-oriented subsidy is unable to affect the level of their effort spent on the projects. To satisfy both parties’ expectations in a PPP, the performance-oriented subsidy needs to be prioritised for a purpose of enabling higher quality outputs.

Practical implications

The game model developed in this study contributes to the literature by offering new insight into the underlying mechanism of governments and private entities, in terms of their decision-making for subsidy planning and contributions (i.e. resource allocation and spending) during the life-cycle of PPPs. This research enriches the government subsidy model by revealing the effects of the GFC and clarifies the impacts of two different schemes of subsidy on the performance of PPPs.

Originality/value

The government has been conventionally viewed as being omnipotent to provide PPPs with a wide range of subsidies. However, the subsidies are not unlimited, due to GFC. In addressing this void, this study has modelled the impacts of government subsidy plans with a consideration of GFC-related constraints. The combined effects of the participation- and performance-oriented subsidies on the project performance of PPPs have been examined.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 20 October 2023

Dan-Yi Wang and Xueqing Wang

In construction projects, engineering variations are very common and create breeding grounds for opportunistic claims. This study investigates the complementary effect between an…

Abstract

Purpose

In construction projects, engineering variations are very common and create breeding grounds for opportunistic claims. This study investigates the complementary effect between an inspection mechanism and a reputation system in deterring opportunistic claims, considering an employer with limited inspection accuracy and a contractor, which can be either reputation-concerned or opportunistic.

Design/methodology/approach

This paper applies a signaling game to investigate the complementary effect between the employer's inspection and a reputation system in deterring the contractor's possible opportunistic claim, considering the information-flow influence of claiming prices.

Findings

This study finds that in the exogenous-inspection-accuracy case, the employer does not always inspect the claim. A more stringent reputation system complements a less accurate inspection only when the inspection cost is lower than a threshold, but may decline the employer's surplus or social welfare. In the optimal-inspection-accuracy case, the employer always inspects the claim. However, only a sufficiently stringent reputation system can guarantee the effectiveness of an optimal inspection in curbing opportunistic claims. A more stringent reputation system has a value-stepping effect on the employer's surplus but may unexpectedly impair social welfare, whereas a higher inspection cost efficiency always reduces social welfare.

Originality/value

This article contributes to the project management literature by combing the signaling game theory with the reputation theory and thus embeds the problem of inspection mechanism design into a broader socio-economic framework.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 August 2023

Yunfeng Liu, Xueqing Wang, Jingxiao Zhang and Sijia Guo

Early termination of public–private partnerships (PPPs) in China is caused by various risk factors, resulting in significant losses. This study aimed to clarify the key factors…

Abstract

Purpose

Early termination of public–private partnerships (PPPs) in China is caused by various risk factors, resulting in significant losses. This study aimed to clarify the key factors and identify the causal relationships among these factors.

Design/methodology/approach

Social network analysis (SNA) was used to analyze 37 risk factors that were summarized from 97 early terminated PPP cases and to identify the relationships among these key risk factors. Interpretive structural modeling (ISM) was conducted to explore the causal relationships. Data were collected from case documents, questionnaires and interviews.

Findings

A total of 17 key risk factors were identified and distributed in a hierarchical structure with six tiers. Among these key risk factors, the root causes affecting the early termination of PPP projects were government oversight in decision-making, local government transition, policy and law changes and force majeure. The direct cause was insufficient returns. Furthermore, local government and private sector defaults were essential mediating factors. Local government transition and the low willingness of the private sector were highlighted as potential key risks.

Research limitations/implications

The cases and experts were all from China, and outcomes in other countries or cultures may differ from those of this study. Therefore, further studies are required.

Practical implications

This research provides knowledge regarding the key risk factors leading to the early termination of PPP projects and guidance on avoiding these factors and blocking the factors' transmission in the project lifecycle.

Originality/value

This study contributes to the knowledge of risk management by emphasizing the importance of local government transition, the low willingness of the private sector and project cooperation and operation, whose significance is ignored in the existing literature. The proposed ISM clarifies the role of risk factors in causing early termination and explains their transmission patterns.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2017

Nini Xia, Xueqing Wang, Ye Wang, Qiubo Yang and Xing Liu

Previous research has little specific guidance on how to improve large infrastructures’ risk analysis. This paper aims to propose a practical risk analysis framework across the…

Abstract

Purpose

Previous research has little specific guidance on how to improve large infrastructures’ risk analysis. This paper aims to propose a practical risk analysis framework across the project lifecycle with Bayesian Networks (BNs).

Design/methodology/approach

The framework includes three phases. In the qualitative phase, primary risks were identified by literature reviews and interviews; questionnaires were used to determine key risks at each project stage and causal relationships between stage-related risks. In the quantitation, brainstorming and questionnaires, and techniques of ranked nodes/paths, risk map and Bayesian truth serum were adopted. Then, a BN-based risk assessment model was developed, and risk analysis was conducted with AgenaRisk software.

Findings

Twenty key risks across the lifecycle were determined: some risks were recurring and different risks emerged at various stages with the construction and feasibility most risky. Results showed that previous stages’ risks significantly amplified subsequent stages’ risks. Based on the causality of stage-related risks, a qualitative model was easily constructed. Ranked nodes/paths facilitated the quantification by requiring less statistical knowledge and fewer parameters than traditional BNs. As articulated by a case, this model yielded very simple and easy-to-understand representations of risks and risk propagation pathways.

Originality/value

Rare research has developed a BN risk assessment model from the perspective of project stages. A structured model, a propagation network among individual risks, stage-related risks, and the final adverse consequence, has been designed. This research provides practitioners with a realistic risk assessment approach and further understanding of dynamic and stage-related risks throughout large infrastructures’ lifecycle. The framework can be modified and used in other real-world risk analysis where risks are complex and develop in stages.

Details

Journal of Engineering, Design and Technology, vol. 15 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 15 June 2021

Xueqing Wang, Yang Li, Zhao Cai and Hefu Liu

This study aims to investigate the impact of experience product portal page aesthetics on bounce rate.

1607

Abstract

Purpose

This study aims to investigate the impact of experience product portal page aesthetics on bounce rate.

Design/methodology/approach

This research collected data from an online shop selling original design furniture on Taobao.com. It employed deep learning algorithm and manual coding to operationalize image and text aesthetics.

Findings

The empirical results indicate that text aesthetics has a U-shaped relationship with bounce rate, whereas the relationship between image aesthetics and bounce rate is insignificant. Moreover, the U-shaped relationship between text aesthetics and bounce rate is weakened by image aesthetics.

Originality/value

This study addresses an important but understudied topic – the bounce rate of experience products in the context of e-commerce. Although the high bounce rate has increasingly gained attention from practitioners, there remains a scarcity of research that addresses the effect of product portal page aesthetics in the specific context of experience products. The authors theorize product portal page aesthetics as the design elements of an e-commerce website and deeply analyzed the role of product portal page aesthetics by classifying it into text aesthetics and image aesthetics. The authors’ findings provide implications for online sellers and platforms to effectively design product profile pages to reduce the bounce rate.

Details

Industrial Management & Data Systems, vol. 121 no. 8
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 19 May 2021

Niluh Putu Dian Rosalina Handayani Narsa and Dwi Marlina Wijayanti

Even though many studies have been conducted in exploring the determinants of job stress, limited research has been conducted in exploring how the internal factors of religious…

Abstract

Purpose

Even though many studies have been conducted in exploring the determinants of job stress, limited research has been conducted in exploring how the internal factors of religious orientation and the relatively new variable in the field of psychology, psychological capital (PsyCap), may relate to job stress. This study aims to examine the influence of PsyCap as a mediating variable on the relationship between religious orientation and job stress.

Design/methodology/approach

This study used self-administered surveys. Data was collected through the completion of online questionnaires. The participants include 208 accountants and business practitioners in Indonesia. Data were analysed using structural equation model-partial least squares.

Findings

The results show that intrinsic (extrinsic) religious orientation is negatively (positively) related to job stress and positively (negatively) related to PsyCap. Additionally, PsyCap mediates the relationship between religious orientation (intrinsic and extrinsic) and job stress. Other results indicate a positive relationship between PsyCap and job stress.

Research limitations/implications

Firstly, the sample used comes from various professions in companies or agencies that function differently. Secondly, this study asks individuals to assess their own job stress, which increases the chance of bias.

Practical implications

The findings of this study will provide a recommendation to the company, particularly the human resources division, to consider candidates’ religious orientation and PsyCap levels during the recruitment process. Thus, the company may observe the employees or individuals who can effectively manage job stress.

Originality/value

This study provides new empirical evidence regarding the relationship between religious orientation, PsyCap and job stress. It shows that the individual’s religious orientation (intrinsic and extrinsic) affects their level of PsyCap (higher and lower), which is a determinant factor in the experience of job stress.

Details

Journal of Asia Business Studies, vol. 15 no. 4
Type: Research Article
ISSN: 1558-7894

Keywords

Article
Publication date: 29 November 2022

Yaoyao Ma, Qiang Miao, Wenping Liang, Haiyang Yu, Mengjuan Yin, Kai Zang, Xueqing Pang and Xianfeng Wang

The purpose of this paper is to obtain the optimal N2/Ar ratio parameters for preparing Ta (C, N) coating. Three coatings with different N2/Ar ratios were prepared on the TA15…

Abstract

Purpose

The purpose of this paper is to obtain the optimal N2/Ar ratio parameters for preparing Ta (C, N) coating. Three coatings with different N2/Ar ratios were prepared on the TA15 substrate, and their effects on the wear properties of the coatings were discussed.

Design/methodology/approach

Ta(C, N) coatings with three different N2/Ar ratios were prepared on TA15 substrates using the double cathode glow metallurgical plasma alloying technique (DGMPA) using a step-by-step diffusion method.

Findings

With the increase of N2/Ar flow ratio, the hardness and elastic modulus of the coating first increase and then decrease. Compared with the S1 sample (N2/Ar gas ratio 25: 75) and the S3 sample (N2/Ar gas ratio 75: 25), the S2 sample (N2/Ar gas ratio 50: 50) has better mechanical properties, with hardness increased by 48.45% and 6.8%, respectively, and elastic strain ratio increased by 22.8% and 28.5%, respectively. Moreover, the wear degree of the S2 sample is less than other samples. The wear rate of the S2 sample was 32.4% lower than the S3 sample at 300°C and 14.3% lower than the S3 sample at 500°C. Therefore, the S2 sample has the best mechanical properties and the best high temperature wear resistance.

Originality/value

Ta(C, N) coatings were prepared by DGMPA technology, and the wear mechanism of Ta(C, N) coatings with different N2/Ar ratios was investigated to reduce the wear rate.

Details

Industrial Lubrication and Tribology, vol. 75 no. 1
Type: Research Article
ISSN: 0036-8792

Keywords

1 – 10 of 30